Madan Mohan Malaviya University of Technology logo Madan Mohan Malaviya University of Technology Gorakhpur · MMMUT SDG Impact Portal
MMMUT Staff Portal
SDG 7: Affordable and Clean Energy
Indicator 7.3.1: Energy usage per sqm

Data Collected Definition Total energy used Total energy used in Gigajoule (GJ) for the year 2024 University floor space Floor space of the university buildings in square metre (m2) in 2024

SDG 7 · Indicator 7.3.1 · Data year 2025

7.3.1 Energy usage per sqm

Answer

Provisional for calendar year 2025: Madan Mohan Malaviya University of Technology, Gorakhpur used 11,288.7 GJ of energy (28,54,660 kWh of grid electricity = 10,276.8 GJ, 2,69,809 kWh of on-campus solar for June–November = 971.3 GJ, and 38.453 MMBTU of piped natural gas for two gas generator sets = 40.6 GJ) in 1,24,123.59 m² of buildings, the built-up area given in the university's Annual Progress Report 2025-26, i.e. 0.0909 GJ per m². Solar bills for January–May and December and the use of diesel, petrol and LPG are still to be added. The electricity and gas bills are attached.

Energy used in 2025 and floor area

Calendar year 2025. Provisional: the solar bills for January–May and December 2025 and the records of diesel, petrol and LPG are still being collected, so the total below will rise when they are added.

Energy source Quantity Energy (GJ)
Grid electricity (PuVVNL) 28,54,660 kWh 10,276.8
Solar electricity from the on-campus plant (June–November 2025) 2,69,809 kWh 971.3
Piped natural gas for two gas generator sets (Torrent Gas, 12 June – 31 December 2025) 1,058.56 SCM = 38.453 MMBTU 40.6
Diesel, petrol, LPG still to be added –
Total energy used 11,288.7
Item Value
Floor area of university buildings (built-up space, Annual Progress Report 2025-26, p. 286; excludes 14,769.86 m² under construction) 1,24,123.59 m²
Energy used per m² 0.0909 GJ/m²

Electricity is converted at 0.0036 GJ per kWh and natural gas at 1.055056 GJ per MMBTU.

Electricity bought from the grid in 2025

The campus buys its grid electricity from Purvanchal Vidyut Vitran Nigam Ltd (PuVVNL) through one 11 kV high-tension connection (contract demand 700 kVA). The twelve monthly bills that meter calendar year 2025 are attached; bank details and contact numbers on them are hidden.

Bill Meter reading period Electricity used (kWh)
February 2025 1 January – 1 February 92,800
March 2025 1 February – 17 March (meter replaced 5 March) 2,15,000
April 2025 17 March – 17 April 2,20,800
May 2025 17 April – 11 May 2,76,000
June 2025 11 May – 2 June 1,92,420
July 2025 2 June – 1 July 2,03,320
August 2025 1 July – 1 August 2,31,500
September 2025 (revised) 1 August – 1 September 2,96,940
October 2025 1 September – 1 October 4,78,840
November 2025 1 October – 1 November 2,29,460
December 2025 1 November – 1 December 1,78,620
January 2026 1 December 2025 – 1 January 2026 2,38,960
Total, 1 January 2025 – 1 January 2026 28,54,660 kWh = 10,276.8 GJ

Consumption is the difference of the kWh meter readings times the meter multiplying factor. The readings run without a gap from 1 January 2025 to 1 January 2026. A provisional bill of March 2025 and the first September 2025 bill were replaced by later bills and are not counted. Units the electricity company assessed while the old meter was faulty are not counted; only metered consumption is used.

Piped natural gas used in 2025

Two gas generator sets run on piped natural gas (PNG) supplied by Torrent Gas Limited: a 125 kVA set at the Administrative Building (Atal Bhawan, customer ID 1000347873, meter 72206543) and a 30 kVA set at the Vice-Chancellor's camp office (customer ID 1000347874, meter 72206525). Both connections were commissioned on 12 June 2025, so 2025 use runs from 12 June to 31 December. Torrent bills every half month; the 26 bills for 2025 are attached (amounts, payment details and contact numbers on them are hidden).

Month (2025) Administrative Building (SCM) VC camp office (SCM) Total (SCM) Total (MMBTU)
June (from 12 June) 9.80 8.90 18.70 0.681
July 171.10 36.30 207.40 7.534
August 149.98 117.50 267.48 9.781
September 163.25 43.84 207.09 7.490
October 133.74 19.96 153.70 5.542
November 60.06 19.08 79.14 2.880
December 107.76 17.29 125.05 4.545
12 June – 31 December 2025 795.69 262.87 1,058.56 38.453 = 40.6 GJ

Each bill states the gas used in standard cubic metres (SCM), the average gross calorific value of the gas (kcal/SCM) and the energy billed in MMBTU (SCM × calorific value ÷ 2,52,000). The MMBTU figures above are the ones printed on the bills. The bills were checked for quality and quantity by the university's construction and maintenance section.

The solar bills are on the low-carbon energy page.

Evidence

  • Electricity bought from the grid: 2,854,660 kWh (Construction & Maintenance Section) — figure verified by the IQAC
  • Solar electricity generated on campus: 269,809.13 kWh (Construction & Maintenance Section) — figure verified by the IQAC
  • Gross floor area of buildings: 124,123.59 m² (Construction & Maintenance Section) — figure verified by the IQAC
  • Piped natural gas used (two gas generator sets): 1,058.56 SCM (Construction & Maintenance Section) — figure verified by the IQAC
  • Grid electricity bought from PuVVNL in 2025 (kWh): 2,854,660 kWh (Construction & Maintenance Section) — figure verified by the IQAC

Supporting documents

Madan Mohan Malaviya University of Technology, Gorakhpur, Uttar Pradesh, India · Published 03 Nov 2026 · Updated 12 Nov 2026 · https://sdg.mmmut.ac.in/evidence/2025/sdg-7/7-3-1